1910 3/23 Engineer? Jon Osscar reports the completion of driving piling for the New Dock at Village of Walkar? 465 pieces being required about 15 more at shore line will be required to hold the filling. The? far-mishard?? 90? Ps. Piling. The? Village Utue?? muacniadm?. The piling unknown are valued at $100 unknown the Driving of 46 5Psi @ 75cent each $348.75. With this we expect a permanent? landing place, unknown with a unknown year privilege secured? in unknown from? believe that a large sooing? has been made without special op-/no/mature?? of any kind. To have?? rebuild our inch? unknown Dock would have required16 G unknown and 100 piles - besides spikes? and considerable more labor and? there? the ice might put us out before it be completed.