1910 3/23 Engineer for Osscar reports the completion of driving piling for the New Dock at Village of Walker 465 pieces being reground about 15 more at shore line will be reground to hold the filling. The unknown go Ps. Pilking. The Village unknown unknown. The piling unknowna are valued at $100 unknown the Driving of 46 5Psi @ 75cent each $348.75. With this we expect a permanent landing place, unknown with a unknown year privilege