.MTI1OQ.MTAwNDk5
1910 3/23 Unknown for Osscar [unknown]] the completion of driving piling for the New Dock at village of Walker 465 pieces being unknown about 15 more unknown should unknown will be required to hold the fillling. The unknown go Ps. Piling. The Village unknown unknown. The piling unknown unknown are valued at $100 unknown. The Driving of 465 Psi @ 75 cent each $348.78. With this we expect a permanent landing place, unknown with a unknown year privilege unknown in unknown unknown believe that a large unknown has been made without special unknown of any kind. To unknown rebuild our unknown permanent Dock would have required 16 G unknown and 100 pilas - besides unknown and of considerable more labor and there the ice might put us out before it could be completed.