.MTI1OQ.MTAwNDk5
1910 3/23 Engineer for Osscar reports the completion of driving piling for the New Dock at Village of Walker 465 pieces being required about 15 more at shore line will be required to hold the filling. The unknown go Ps. Piling. The Village unknown unknown. The piling unknown are valued at $100 unknown the Driving of 46 5Psi @ 75cent each $348.75. With this we expect a permanent landing place, unknown with a unknown year privilege secured in unknown from believe that a large unknown has been made without special unknown of any kind. To have rebuild our unknown unknown Dock would have required16 G unknown and 100 piles - besides spokes are of considerable more labor and there the ice might put us out before it be completed.