.MTI1OQ.MTAwNDk5: Difference between revisions

From Newberry Transcribe
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
1910
1910
3/23 [[Engineer]] for [[Osscar]] reports the completion of driving piling for the New Dock at Village of [[Walker]] 465 pieces being required about 15 more at shore line will be required to hold the filling. The [[unknown]] go Ps. Piling. [[The]] Village [[unknown]] [[unknown]].
3/23 [[Engineer?]] for [[Osscar?]] reports the completion of driving piling for the New Dock at Village of [[Walker?]] 465 pieces being required about 15 more at shore line will be required to hold the filling. The [[unknown]] go Ps. Piling. [[The?]] Village [[unknown]] [[unknown]].
The piling [[unknown]] are valued at $100 [[unknown]] the Driving of 46 5Psi @ 75cent each $348.75.
The piling [[unknown]] are valued at $100 [[unknown]] the Driving of 46 5Psi @ 75cent each $348.75.
With this we expect a [[permanent]] landing place, [[unknown]] with a [[unknown]] year privilege [[secured]] in [[unknown]] [[from]] believe that a large [[unknown]] has been made without special [[unknown]] of any kind.
With this we expect a [[permanent?]] landing place, [[unknown]] with a [[unknown]] year privilege [[secured?]] in [[unknown]] [[from?]] believe that a large [[unknown]] has been made without special [[unknown]] of any kind.
To have rebuild our [[unknown]] [[unknown]] Dock would have required16 G [[unknown]] and 100 piles - besides [[spokes]] are of considerable more labor [[and]] [[there]] the ice might put us out before it be completed.
To have rebuild our [[unknown]] [[unknown]] Dock would have required16 G [[unknown]] and 100 piles - besides [[spikes?]] are of considerable more labor [[and?]] [[there?]] the ice might put us out before it be completed.

Revision as of 18:49, 1 November 2020

1910 3/23 Engineer? for Osscar? reports the completion of driving piling for the New Dock at Village of Walker? 465 pieces being required about 15 more at shore line will be required to hold the filling. The unknown go Ps. Piling. The? Village unknown unknown. The piling unknown are valued at $100 unknown the Driving of 46 5Psi @ 75cent each $348.75. With this we expect a permanent? landing place, unknown with a unknown year privilege secured? in unknown from? believe that a large unknown has been made without special unknown of any kind. To have rebuild our unknown unknown Dock would have required16 G unknown and 100 piles - besides spikes? are of considerable more labor and? there? the ice might put us out before it be completed.