3/23 [[Engineer]] for [[Osscar]] reports the completion of driving piling for [[the]] New Dock at Village of [[Walker]] 465 pieces being [[reground]] about 15 more at shore line will be [[reground]] to hold the filling. The [[unknown]] go Ps. Pilking. [[The]] Village [[unknown]] [[unknown]]. | 3/23 [[Engineer]] for [[Osscar]] reports the completion of driving piling for [[the]] New Dock at Village of [[Walker]] 465 pieces being [[reground]] about 15 more at shore line will be [[reground]] to hold the filling. The [[unknown]] go Ps. Pilking. [[The]] Village [[unknown]] [[unknown]]. | ||
The piling [[unknown]]a are valued at $100 [[unknown]] the Driving of 46 5Psi @ 75cent each $348.75. | The piling [[unknown]]a are valued at $100 [[unknown]] the Driving of 46 5Psi @ 75cent each $348.75. | ||
With this we expect a [[permanent]] landing place, [[unknown]] with a [[unknown]] year privilege | With this we expect a [[permanent]] landing place, [[unknown]] with a [[unknown]] year privilege [[unknown]] in [[unknown]] [[unknown]] belie ve that a large [[unknown]] has been made without special [[unknown]] of any kind. | ||
To have rebuild our [[unknown]] [[unknown]] Duck would have [[reground]] 16 G [[unknown]] and 100 piles - besides [[spokes]] are of considerable more labor [[unknown]] the ice might put is out before it be completed. |
Revision as of 20:26, 22 October 2020
1910 3/23 Engineer for Osscar reports the completion of driving piling for the New Dock at Village of Walker 465 pieces being reground about 15 more at shore line will be reground to hold the filling. The unknown go Ps. Pilking. The Village unknown unknown. The piling unknowna are valued at $100 unknown the Driving of 46 5Psi @ 75cent each $348.75. With this we expect a permanent landing place, unknown with a unknown year privilege unknown in unknown unknown belie ve that a large unknown has been made without special unknown of any kind. To have rebuild our unknown unknown Duck would have reground 16 G unknown and 100 piles - besides spokes are of considerable more labor unknown the ice might put is out before it be completed.