1910
1910
3/23 [[Engineer]] for [[Osscar]] [unknown]] the completion of [[driving]] [[piling]] for [[the]] [[New]] Dock at village of [[Walker]] 465 [[pieces]] being [[unknown]] about 15 more [[unknown]] should [[unknown]] will be [[unknown]] to hold the [[fillling]]. He [[unknown]] go Ps. Piling. The Village [[unknown]] [[unknown]].
3/23 [[Unknown]] for [[Osscar]] [unknown]] the completion of [[driving]] [[piling]] for [[the]] [[New]] Dock at village of [[Walker]] 465 [[pieces]] being [[unknown]] about 15 more [[unknown]] should [[unknown]] will be [[required]] to hold the [[fillling]]. The [[unknown]] go Ps. Piling. The Village [[unknown]] [[unknown]].
The [[piling]] [[unknown]] [[unknown]] are valued at $100 [[unknown]]. The Driving of 465 Psi @ 75 cent each $348.78.
The [[piling]] [[unknown]] [[unknown]] are valued at $100 [[unknown]]. The Driving of 465 Psi @ 75 cent each $348.78.
With this we expect a [[unknown]] landing place, [[unknown]] with a [[unknown]] [[year]] privilege [[unknown]] in [[unknown]] [[unknown]] believe that a large [[unknown]] has been made without special [[unknown]] of any kind.
With this we expect a [[permanent]] landing place, [[unknown]] with a [[unknown]] [[year]] privilege [[unknown]] in [[unknown]] [[unknown]] believe that a large [[unknown]] has been made without special [[unknown]] of any kind.
To [[unknown]] rebuild our [[unknown]] [[unknown]] Dock would have [[unknown]] 16 G [[unknown]] and 100 [[pilas]] - [[besides]] [[unknown]] and considerable more labor and [[their]] [[unknown]] [[unknown]] might put us out before it could be completed.
To [[unknown]] rebuild our [[unknown]] [[permanent]] Dock would have [[required]] 16 G [[unknown]] and 100 [[pilas]] - [[besides]] [[unknown]] and of considerable more labor and there the ice might put us out before it could be completed.

Revision as of 17:33, 22 October 2020

1910 3/23 Unknown for Osscar [unknown]] the completion of driving piling for the New Dock at village of Walker 465 pieces being unknown about 15 more unknown should unknown will be required to hold the fillling. The unknown go Ps. Piling. The Village unknown unknown. The piling unknown unknown are valued at $100 unknown. The Driving of 465 Psi @ 75 cent each $348.78. With this we expect a permanent landing place, unknown with a unknown year privilege unknown in unknown unknown believe that a large unknown has been made without special unknown of any kind. To unknown rebuild our unknown permanent Dock would have required 16 G unknown and 100 pilas - besides unknown and of considerable more labor and there the ice might put us out before it could be completed.