3/23 Received the [[unknown]] of [[unknown]] [[unknown]] [[unknown]] to the [[unknown]]
3/23 [[Engineer?]] Jon Osscar reports the completion of driving piling for the New Dock at Village of [[Walkar?]] 465 pieces being required about 15 more at shore line will be required to hold the filling. [[The?]] [[far-mishard??]] [[90?]] Ps. Piling. [[The?]] Village [[Utue??]] [[muacniadm?]].
[[unknown]] [[unknown]] - [[unknown]] [[unknown]] [[unknown]] E. Dr. White and R. I. Brooks [[Jos.]].
The piling [[unknown]] are valued at $100 [[unknown]] the Driving of 46 5Psi @ 75cent each $348.75.
3/25 J. [[unknown]]. [[Grangoldt]] [[unknown]] [[unknown]] [[unknown]] R. Clarke and [[in]] [[unknown]] [[unknown]]. [[unknown]] M. N. [[unknown]] [[unknown]].
With this we expect a [[permanent?]] landing place, [[unknown]] with a [[unknown]] year privilege [[secured?]] in [[unknown]] [[from?]] believe that a large [[sooing?]] has been made without special [[op-/no/mature??]] of any kind.
3/28/10 Mr. [[unknown]] [[unknown]] the bank [[unknown]] was [[unknown]] by the ice inside being missed by a full [[unknown]] of [[unknown]] - [[unknown]] [[unknown]] [[unknown]] [[unknown]] to look it over and [[unknown]] it [[unknown]].
To [[have??]] rebuild our [[inch?]] [[unknown]] Dock would have required16 G [[unknown]] and 100 piles - besides [[spikes?]] and considerable more labor [[and?]] [[there?]] the ice might put us out before it be completed.
3/29/10 Mrs. [[Sehulte]] laid up with [[unknown]] on [[unknown]] Mrs. Fairbanks on hand to get support and stay until [[Mrs.]] [[Sehulte] able to get around.
[[unknown]] [[unknown]] inportant very weak - pulse low - must have nurse all night. Miss [[Malong]] & Miss [[unknown]] to [[unknown]] this [[unknown]] for the [[unknown]].
 
[[in the margin]] [[unknown]] [[received]] for all [[unknown]] [[unknown]].

Latest revision as of 18:26, 8 November 2020

1910 3/23 Engineer? Jon Osscar reports the completion of driving piling for the New Dock at Village of Walkar? 465 pieces being required about 15 more at shore line will be required to hold the filling. The? far-mishard?? 90? Ps. Piling. The? Village Utue?? muacniadm?. The piling unknown are valued at $100 unknown the Driving of 46 5Psi @ 75cent each $348.75. With this we expect a permanent? landing place, unknown with a unknown year privilege secured? in unknown from? believe that a large sooing? has been made without special op-/no/mature?? of any kind. To have?? rebuild our inch? unknown Dock would have required16 G unknown and 100 piles - besides spikes? and considerable more labor and? there? the ice might put us out before it be completed.